425 EAST MAIDEN ST. | WASHINGTON, PA 15301
WWW.WESTTIRE.COM
M-F: 8am - 5pm
Sat: 8am - 12pm ( 2ND AND LAST SATURDAY OF THE MONTH)
Sun: Closed
Select a different product line
The Aralon breaker construction L-5 has an extra-deep, non-directional tread for loader/dozer in severe mining, quarrying, logging and rock handling operations